generator
traffic systems

Outline of Typical
System Assessment Services
Provided

  • General CCTV System Development
    • Determine Current CCTV System Design Standards
      • Define Purpose of the CCTV System (Present-Future)
      • Define Operator Interface Standards
      • Define Integration Level with Sub-Systems
      • Define CCTV Video and Control Data Criteria
    • Determine Feasibility for Existing System Expansion, Upgrade, or Replacement
      • Review Existing Hardware
      • Review Existing Control Data Distribution Methods
      • Review Existing Integration to Sub-Systems
  • Expansion, Upgrade, or Replacement Development
    • Define Short Term Expansion Requirements
      • Define Required Hardware Compatibly
        • Video Switchers
        • Pan/Tilt/Zoom cameras
        • Alarm Interfaces
      • Define Required Control Data Criteria
        • Rewire Existing Data Links
        • Additional Hardware
    • Define Upgrade Requirements
      • Define Required Software Features
        • Video Switchers
        • Pan/Tilt/Zoom cameras
        • Alarm Interfaces
      • Define Required Control Data Criteria
        • Rewire Existing Data Links
        • Add new hardware for Data Links
        • Additional Hardware
    • Define Replacement Requirements
      • Determine Current CCTV System Design Standards
        • Define Operator Interface Standards
        • Define Integration Level with Sub-Systems
        • Define CCTV Video and Control Data Criteria
      • Define Required Software Features
        • Video Switchers
        • Pan/Tilt/Zoom cameras Alarm Interfaces
      • Define Required Control Data Criteria
        • Rewire Existing Data Links
        • Additional Hardware

right column content